HytaleModding
HytaleModding
World GenerationTechnical Hytale Generator

Curves

Curves map decimal values to other decimal values. They enable the basic f(x) = y math expression. These nodes can be used to build the functions you need in world-gen.

Official Hytale Documentation
All content on this section is provided by Hypixel Studios Canada Inc. and is presented without any substantial changes, aside from visual design adjustments by the HytaleModding Team.

Manual

You can plot points that connect with lines to create the curve. The points are connected with straight lines. The function is constant before the first point and after the last point.

The example above shows a function made of 3 points.


DistanceExponential

The DistanceExponential Curve has the following shape depending on the Exponent value. As this curve’s input approaches the Range value, it outputs 0.0. At an input of 0.0, this curve outputs 1.0.

Parameters:

NameTypeDescription
Exponentpositive decimal numberAffects the curve’s shape like in the diagram above.
Rangepositive decimal numberThe value after which the curve outputs a constant 0.0.

DistanceS

The DistanceS Curve combines two DistanceExponential curves to produce a shape similar to the diagram below. As this curve’s input approaches the Range value, it outputs 0.0. At an input of 0.0, this curve outputs 1.0. The asset’s parameters allow you to tweak the shape of the curve.

Below are some examples of Positions2D terrain using this curve.

Parameters:

NameTypeDescription
ExponentAdecimal value greater than 0.0Affects the curve’s shape in the first half of the range.
ExponentBdecimal value greater than 0.0Affects the curve’s shape in the second half of the range.
Rangedecimal value greater than 0.0The value after which the curve outputs a constant 0.0.
Transitionoptional decimal value between 0.0 and 1.0 with a default of 1.0

Values close to 0.0 create a curve with a faster, more sudden transition between ExponentA and ExponentB. Values of 1.0 transition from ExponentA to ExponentB over the entire curve.

TransitionSmoothoptional decimal value between 0.0 and 1.0 with a default of 1.0

Affects the shape of the transition. Lower values can result in a sharper curve in some situations. Try different values while you design to get a feel for it.


Ceiling

This curve puts a ceiling on the output of the child curve asset.

Parameters:

NameTypeDescription
Ceilingdecimal numberThe maximum value this curve will output.
Curvecurve slot

Floor

This curve puts a floor on the output of the child curve asset.

Parameters:

NameTypeDescription
Floordecimal numberThe minimum value this curve will output.
Curvecurve slot

SmoothCeiling

This curve puts a ceiling on the output of the child curve asset. As the curve approaches the ceiling within the provided range, it gets smoothed.

Parameters:

NameTypeDescription
Ceilingdecimal numberThe maximum value this curve will output.
Rangedecimal number, greater or equal to 0

The range determines how much smoothing is applied. A good starting value would be ¼ of the known range of your child curve.

Curvecurve slot
NameTypeDescription
Ceilingdecimal numberThe maximum value this curve will output.
Rangedecimal number, greater than or equal to 0

The range determines how much smoothing is applied. A good starting value would be ¼ of the known range of your child curve.

Curvecurve slot

SmoothFloor

This curve puts a floor on the output of the child curve asset. As the curve approaches the floor within the provided range, it gets smoothed.

Parameters:

NameTypeDescription
Floordecimal numberThe minimum value this curve will output.
Rangedecimal number, greater or equal to 0

The range determines how much smoothing is applied. A good starting value would be ¼ of the known range of your child curve.

Curvecurve slot
NameTypeDescription
Floordecimal numberThe minimum value this curve will output.
Rangedecimal number, greater than or equal to 0

The range determines how much smoothing is applied. A good starting value would be ¼ of the known range of your child curve.

Curvecurve slot

SmoothClamp

This curve limits the range of the child curve asset within the provided walls. As the curve approaches the limits within the provided range, it gets smoothed.

Parameters:

NameTypeDescription
WallAdecimal number
WallBdecimal number
Rangedecimal number, greater or equal to 0

The range determines how much smoothing is applied. A good starting value would be ¼ of the known range of your child curve.

Curvecurve slot
NameTypeDescription
WallAdecimal number
WallBdecimal number
Rangedecimal number, greater than or equal to 0

The range determines how much smoothing is applied. A good starting value would be ¼ of the known range of your child curve.

Curvecurve slot

SmoothMax

This curve retrieves the maximum between the two curves provided. The intersection between the curves is smoothed as their values approach within the provided range.

Parameters:

NameTypeDescription
Rangedecimal number, greater than or equal to 0

The range determines how much smoothing is applied. A good starting value would be ¼ of the known range of your child curves.

CurveAcurve slot
CurveBcurve slot

SmoothMin

This curve retrieves the minimum between the two curves provided. The intersection between the curves is smoothed as their values approach within the provided range.

Parameters:

NameTypeDescription
Rangedecimal number, greater than or equal to 0

The range determines how much smoothing is applied. A good starting value would be ¼ of the known range of your child curves.

CurveAcurve slot
CurveBcurve slot

Clamp

This clamps the curve between the two wall values provided. The output of this curve will never reach outside the walls.

Parameters:

NameTypeDescription
WallAdecimal number
WallBdecimal number
Curvecurve slot

Inverter

This inverts the child curve such that positive values become negative and negative values become positive.

Parameters:

NameTypeDescription
Curvecurve slot

Max

This outputs the maximum value of all the child curves.

Parameters:

NameTypeDescription
Curveslist of curve slots

Min

This outputs the minimum value of all the child curves.

Parameters:

NameTypeDescription
Curveslist of curve slots

Multiplier

This multiplies all the child curves’ outputs.

Parameters:

NameTypeDescription
Curveslist of curve slots

Not

This applies a logical NOT operation on the child curve. When the child’s output is 1, this will output 0, and when the child’s output is 0, this will output 1. All numbers in between are scaled accordingly.

Parameters:

NameTypeDescription
Curvecurve slot

Sum

This adds the values of all the provided curves.

Parameters:

NameTypeDescription
Curveslist of curve slots

Imported

Imports an exported Curve.

Parameters:

NameTypeDescription
NamestringThe exported Curve asset.